History
It’s a true regional effort—bringing communities, organizations, and supporters together to complete the connection.
Follow the Journey. Be Part of the Connection. Follow us on Social Media.
Timeline
-
1976
Regional Bikeway Vision
The Northeastern Indiana Regional Coordinating Council creates a Regional Bikeway Plan that proposed routes stretching north of Fort Wayne through DeKalb County, into Steuben County, and south through Bluffton to Ouabache State Park—remarkably similar to the path we’re working toward today. What started as lines on a planning map decades ago is becoming a real connection for our communities.
-
1991
Funding for Trails Across the Country
Interest in bike and pedestrian infrastructure surged again in 1991 with the Intermodal Surface Transportation Efficiency Act (ISTEA), which introduced dedicated funding for trails and bike-ped projects across the country. In the early 2000s, local advocates began encouraging officials to include trails as part of roadway design, not just scenic recreation. It marked an important shift toward building trails that connect communities and serve as real transportation routes.
-
2000
A Shift Happening Across NE Indiana
Between 2000 and 2010, public support for active transportation—walking, biking, and connected trails—grew rapidly across northeast Indiana.
-
2005
1st Comprehensive Bike/Pedestrian Plan
Thanks to continued efforts from local trail advocates, the NIRCC 2030 Transportation Plan introduces the region’s first comprehensive bicycle and pedestrian plan. For the first time, the Poka-Bache Connector corridor appeared as a proposed trail in Allen County—an important step in turning a long-standing vision into a real regional connection.
-
2005
Hiring a Greenways Manager
The City of Fort Wayne took a major step forward by hiring a Greenways Manager, helping lead a more coordinated effort to expand trail connections. Working alongside NIRCC and local trail advocates, the region began embracing a regional approach to trail connectivity. Communities weren’t just building trails for recreation anymore—they were building them to connect people and places.
-
2006
Upstate Indiana Trail
The Indiana Department of Natural Resources Division of Outdoor Recreation names the four-county Upstate Indiana Trail—now known as the Poka-Bache Connector—an inaugural Visionary Trail in the state’s first trail plan, Hoosiers on the Move: Indiana State Trails, Greenways & Bikeways Plan. The plan followed the same four-county route we’re working toward today—from Ouabache State Park to Pokagon State Park—and the corridor has continued to be recognized as a priority visionary trail in later state plans.
-
2006
Bluffton Begins Interurban Trail
With a 2006 Transportation Enhancement (TE) grant, Bluffton begins work on the Interurban Trail, a section of the Poka-Bache Connector running from the Wabash River pedestrian bridge to Monroe Street along State Road 1.
-
2007
Steuben County Plans Trail Network
In Steuben County, a 2007 feasibility study explores trail connections to Pokagon State Park, helping guide future development. The City of Angola then begins building its trail network.
-
2007
Pufferbelly Trail Begins
The first section of the Pufferbelly Trail is constructed as part of the Salomon Farm trail loop from the Parkview YMCA entrance to Dupont Road.
-
2010
Auburn Expands Trail Network
Auburn builds the Rieke Park Trail along the former rail alignment going through Rieke Park from North Street to Betz Road.
-
2010
Angola Opens Its First Trail Segment
The City of Angola opens its first segment of the trail in 2010, with additional phases completed in 2016 and 2019.
-
2010
Pufferbelly Trail Begins
The first section of the Pufferbelly Trail is completed from Wallen Road to Dupont Road.
-
2011
Auburn Completes Trail Link
Auburn completes a trail segment connecting the Auburn Cord Duesenberg Museum to the existing Rieke Park Trail at North Street, utilizing a 2009 Transportation Enhancement (TE) grant, by widening sidewalks to trail width.
-
2013
Trail Connection in Auburn
A trail is built along Betz Road in Auburn connecting the Rieke Park Trail with the Auburn-Waterloo Trail at CR 427.
-
2014
Pufferbelly Trail Expands
Pufferbelly Trail in Fort Wayne extends from Dupont Road to Carroll Road.
-
2015
Allen County Trail Connection
Pufferbelly Trail adds a section in Allen County connecting Carroll Road to Life Bridge Church.
-
2016
Poka-Bache Connector Named
The Upstate Indiana Trail is officially renamed the Poka-Bache Connector, reflecting the growing effort to connect our communities and state parks. Around the same time, the Northeastern Indiana Regional Coordinating Council (NIRCC) launched United Trails in 2017 to help guide regional trail planning and development.
-
2016
Bluffton Interurban Trail
Bluffton’s Interurban Trail is completed, creating another important link in the corridor. Across all four counties, communities have pursued state trail and transportation funding to build these connections.
-
2017
Pufferbelly Trail Expands
More sections of the Pufferbelly Trail are completed: Ludwig to Wallen Road, Along Ice Way Drive from Fernhill Ave. to Lima Road and from north of State Blvd. to Franke Park and Fernhill Ave. The Poka-Bache also extended from Foster Park to Bluffton Road and along Bluffton Road to Lower Huntington Road.
-
2018
River Greenway Connection
Pufferbelly Trail in Fort Wayne completes an important section from Fourth Street to North of State Blvd where it connects to the River Greenway. Also during 2018, a section from Washington Center Road to Ludwig Road is completed.
-
2021
Waterloo Trail Extension
Auburn-Waterloo Trail extends in Waterloo along CR 427 (Wayne St.) from Cedar to Walnut Streets with an RTP Grant.
-
2023
Regional Partnership Formed
The 11 jurisdictions along the Poka-Bache Connector corridor signs an interlocal agreement to form a regional task force dedicated to completing the trail. Working alongside them is a strong coalition of private-sector partners—including Fort Wayne Trails, Steuben County Trails, DeKalb County Trails, Community Foundation DeKalb County, and Wells County Trails—all collaborating to move the project forward. Together, these partners are prioritizing trail planning and construction to support health and wellness, economic development, tourism, and access to the natural environment across northeast Indiana.
-
2023
Another Pufferbelly Trail Extension
In Allen County, a section of the Pufferbelly Trail from Life Bridge Church to Fitch Road is completed.
-
2024
Bluffton Trail Extension
Bluffton extends the Interurban Trail over a mile up to the Lancaster Park.
-
2025
Washington Center Road Crossing
Trail Crossing Washington Center Road is completed. This segment of the Pufferbelly Trail is designed to tie directly or indirectly (via sidewalks) to hundreds of businesses and many residential areas along the Washington Center Road corridor, the Lima Road Corridor, the Coliseum Boulevard corridor and the Coldwater Road/Clinton Street Corridor.
-
2026
Vann Family Crossing Bridge Approved
Fort Wayne City Council approves plans for the Pufferbelly Trail Pedestrian Bridge, also referred to as the Vann Family Crossing that will be constructed across Coliseum Boulevard. The bridge will carry the Pufferbelly Trail over the roadway. Construction of the bridge is expected to start in the fall of 2026 and finish end of 2027.
CONNECTING COMMUNITIES
Poke-Bache Task Force
201 S. Jackson Street #24 • Auburn, IN 46706-9998
[email protected]
© Poka-Bache Connector Trail. All rights reserved.